Solari: Bale issue is an internal matter

first_imgSantiago Solari says he will deal with Gareth Bale in private after the Real Madrid forward reportedly left their loss to Real Sociedad early.Bale was not in the squad for Sunday’s 2-0 La Liga defeat at the Santiago Bernabeu as the Wales international is sidelined by a calf injury.But with Madrid slipping to a sixth loss of the league season, Bale was pictured driving away from the stadium with more than 10 minutes to go. Article continues below Editors’ Picks ‘There is no creativity’ – Can Solskjaer get Man Utd scoring freely again? ‘Everyone legged it on to the pitch!’ – How Foden went from Man City superfan to future superstar Emery out of jail – for now – as brilliant Pepe papers over Arsenal’s cracks What is Manchester United’s ownership situation and how would Kevin Glazer’s sale of shares affect the club? Although Bale starred at the Club World Cup with a hat-trick in the semi-final against Kashima Antlers, his La Liga form has been mixed.The 29-year-old has only scored one league goal since September 1 and has again been linked with a move away from Madrid.Solari, though, would not reveal whether or not Bale will be punished for leaving the Sociedad match before full-time when he spoke to reporters ahead of Wednesday’s Copa del Rey tie at home to Leganes.”The fact that Bale left the Bernabeu is something to be solved inside the dressing room,” Solari told a news conference.2018 has been a great year. Onwards and upwards and here’s to 2019. Happy New Year!  pic.twitter.com/EWmfsecMAW— Gareth Bale (@GarethBale11) December 31, 2018Solari was left frustrated by VAR after the technology was not used to award Vinicius Jr a penalty during his side’s defeat to La Real, which left Madrid fifth in the table and 10 points behind leaders Barcelona.And the under-pressure coach again hit out at the use of VAR ahead of Leganes’ visit for the first leg of their last-16 tie.”It all depends on the rules being more clear than the technology,” he added.”If the rules are applied in the same way then it doesn’t really clear things up.”Sometimes as a spectator, I don’t understand how it works. They will perfect it.”The other days they were not complaints, just us defending ourselves, which is our right.”Solari is unsure whether Brahim Diaz, who joined the club from Manchester City this week, will be available to face Leganes.”Brahim is fine, very happy to join Real Madrid,” he continued. “He made a great choice picking the number 21 [also worn by Solari at Madrid].”It will depend on administrative paperwork, I’d imagine.”last_img read more

Sweltering heat persists in Delhi weatherman forecasts rain Sunday

first_imgNew Delhi: Delhiites can expect some relief from sweltering heat on Sunday as the weatherman has forecast dust storm and light rain. On Saturday, the minimum temperature was recorded at 27.8 degrees Celsius, normal for this time of the year. Humidity was recorded at 36 per cent. The weatherman has forecast partly cloudy skies and dust-laden winds in the later half of the day. The maximum temperature is likely to settle around 43 degrees Celsius. The weatherman has forecast the possibility of a dust storm and light rain on Sunday. The Safdarjung Observatory, which provides official figure for the city, recorded a high of 43.7 degrees Celsius and a low of 29.6 degrees Celsius on Friday.last_img read more

Essequibo without electricity 1 day after commissioning of 18B power plant

Share this:Click to share on Twitter (Opens in new window)Click to share on Facebook (Opens in new window)RelatedEssequibians promised “continuous and reliable supply of electricity” when new plant is completedSeptember 4, 2018In “latest news”GPL’s CEO apologises for prolonged power outages in Region 2September 10, 2018In “latest news”GPL to restore full power to Essequibo, after residents suffer 20 hour outageDecember 11, 2013In “Local News” Residents on the Essequibo Coast are faced once again with constant power outages just one day after the commissioning of a $1.8 billion power plant at Anna Regina.The multi billion dollars plant was commissioned by Prime Minister Moses Nagamootoo and other government officials who boasted that with the new power plant, there will be stable and reliable flow of electricity.The $1.8 Billion power plant that was commissioned on SaturdayHowever, mere hours after the launch, the entire coast was plunged into darkness.  At that time, resident thought it was just a changeover but they remained without electricity. Today, the situation worsened with the current fluctuating all day.Minister Patterson at the opening ceremony told the gathering that the three generators that were installed are new and have a lifespan of over 20 years. read more